United States βΊ Grid βΊ Interconnection queues βΊ Maryland
BATTERY STORAGE Β· PJMBattery storage project AC1-224, Talbot County
Battery storage project AC1-224, Talbot County is a 1.0 MW battery storage request withdrawn in the PJM interconnection queue, in Talbot County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-224
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Wye Mills 25kV
- Location
- Talbot County, Maryland
- Technology
- Battery: 1.0 MW
- Total requested
- 1.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 31 October 2016
- Proposed online date
- February 2017
- Withdrawn
- April 2018
Location
Marker shows the centre of Talbot County; the queue data does not give exact sites.
Other requests in Talbot County
- Wye Mills Solar SiteSolar Β· 10.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Crockett Solar ProjectSolar Β· 44.0 MW Β· withdrawn
- Solar project AA1-143, Talbot CountySolar Β· 20.0 MW Β· withdrawn
- Battery storage project AG2-379, Talbot CountyBattery storage Β· 20.0 MW Β· withdrawn
- Crockett Solar ProjectSolar Β· 15.0 MW Β· withdrawn
- Solar project AA2-150, Talbot CountySolar Β· 10.0 MW Β· withdrawn
- Solar project Y1-081, Talbot CountySolar Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem