Crockett Solar Project

Crockett Solar Project is a 15.0 MW solar request withdrawn in the PJM interconnection queue, in Talbot County, Maryland, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF1-015
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Connection point (POI)
Easton-Steele 138 kV II
Location
Talbot County, Maryland
Technology
Solar: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Withdrawn
Entered queue
3 April 2019
Proposed online date
March 2026
Withdrawn
June 2025

Location

Marker shows the centre of Talbot County; the queue data does not give exact sites.