United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AB1-032, Athens County
Solar project AB1-032, Athens County is a 3.3 MW solar request withdrawn in the PJM interconnection queue, in Athens County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2015 (completed)
- Withdrawn / abandonedAug 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-032
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Lee Station Southwest 12kV
- Location
- Athens County, Ohio
- Technology
- Solar: 3.3 MW
- Total requested
- 3.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 31 July 2015
- Proposed online date
- December 2016
- Withdrawn
- August 2017
Location
Marker shows the centre of Athens County; the queue data does not give exact sites.
Other requests in Athens County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem