Solar + storage project AG1-077, Magoffin County

Solar + storage project AG1-077, Magoffin County is a 3.7 MW solar + storage request withdrawn in the PJM interconnection queue, in Magoffin County, Kentucky, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-077
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Allegheny Tunnel 23 kV
Location
Magoffin County, Kentucky
Technology
Solar: 3.7 MW Β· Battery
Total requested
3.7 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2020
Proposed online date
May 2022
Withdrawn
September 2021

Location

Marker shows the centre of Magoffin County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Magoffin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem