ONSHORE WIND Β· WEST

Onshore wind project GI-0914, Lyon County

Onshore wind project GI-0914, Lyon County is a 3.6 MW onshore wind request withdrawn in the West interconnection queue, in Lyon County, Minnesota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0914
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Marshall 115kV
Location
Lyon County, Minnesota
Technology
Wind: 3.6 MW
Total requested
3.6 MW
Service type
Energy only (ERIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
11 May 2009
Proposed online date
June 2010

Location

Marker shows the centre of Lyon County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Lyon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem