United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 46
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GI-TC-2024-14, Weld County Solar |
206 MW | In study |
| Maximino Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
206 MW | In study |
| Varadero Solar Solar · NextEra Energy Interconnection Holdings, LLC |
206 MW | In study |
| Onshore wind project C2-92, Bingham County Onshore wind · PacifiCorp |
206 MW | In study |
| Rock N' Roll Storage Two Solar + storage · Rock N‚Äô Roll Solar, LLC |
206 MW | In study |
| Plant Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
206 MW | In study |
| Anglin BESS Battery storage · Fort Worth BESS LLC |
206 MW | In study |
| Onshore wind project MPC04400, Grand Forks County Onshore wind |
206 MW | In study |
| Supra Wind Onshore wind · NextEra Energy Interconnection Holdings, LLC |
206 MW | In study |
| Roan Solar Phase 1 Solar · Roan Solar, LLC |
206 MW | In study |
| Amphion Solar Phase 2 Solar · Amphion Solar, LLC |
206 MW | In study |
| Artio Energy Storage Battery storage · Artio Energy Storage LLC |
206 MW | In study |
| Roan Solar Phase 2 Solar · Roan Solar, LLC |
206 MW | In study |
| Shaula I BESS Solar + storage · Shaula Energy Project LLC |
206 MW | In study |
| Hamby Solar Solar · Abilene GCE LLC |
206 MW | In study |
| Solar + storage project J3586, Montgomery County Solar + storage |
206 MW | In study |
| Yellow Leaf II BESS Solar + storage · Yellow Leaf 2 BESS LLC |
206 MW | In study |
| Alila BESS II Solar + storage · Electra Energy Project, LLC |
206 MW | In study |
| Emerita Energy Storage Battery storage |
206 MW | In study |
| Sunflower Valley Storage Battery storage · Sunflower Valley Storage, LLC |
206 MW | In study |
| Caesar Storage Solar + storage · Caesar Solar, LLC |
206 MW | In study |
| Forts Trail BESS 2 Solar + storage · JC Central Bluff, LLC |
206 MW | In study |
| Bhalu Storage Battery storage · Bhalu Storage, LLC |
206 MW | In study |
| Crios BESS Battery storage · BRP Crios BESS LLC |
206 MW | In study |
| Cado Storage Battery storage · Cado Storage, LLC |
206 MW | In study |
| Trivor BESS Battery storage · BRP Trivor BESS LLC |
206 MW | In study |
| Pleiades Storage Battery storage · Pleiades Storage, LLC |
206 MW | In study |
| Sisters Solar II Solar + storage · Oberon Solar III, LLC |
206 MW | In study |
| Helios Grid Reliability Battery storage |
206 MW | In study |
| BRP Triton BESS Battery storage · BRP Triton BESS LLC |
205 MW | In study |
| Telluride Solar + storage |
205 MW | In study |
| Hittson Creek BESS Solar + storage · 174 Power Global Properties |
205 MW | In study |
| Soda Lake BESS 2 SLF Solar + storage · Crane II Solar Electric, LLC |
205 MW | In study |
| Cabrera Reliability Battery storage |
205 MW | In study |
| Tri-X BESS 1 SLF Solar + storage · Crane I Solar Electric, LLC |
205 MW | In study |
| Shaula III Solar Solar + storage · Shaula Energy Project III, LLC |
205 MW | In study |
| Allthorn BESS Solar + storage · ALLTHORN SOLAR, LLC |
205 MW | In study |
| Les Energy Storage Battery storage · Rocky Mountain Energy Development, LLC |
205 MW | In study |
| Sepik BESS Battery storage · BRP Sepik BESS LLC |
205 MW | In study |
| Gas project J2947, Rock County Gas |
205 MW | In study |
| Tomahawk Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
205 MW | In study |
| Taylor County Paul Storage Battery storage · DM-TCP, LLC |
205 MW | In study |
| Solar + storage project G1062, Umatilla County Solar + storage |
205 MW | In study |
| East Fishkill Battery storage · East Fishkill Storage 1, LLC |
205 MW | In study |
| Bell County Leifester Storage Battery storage · DM-BCRCML, LLC |
205 MW | In study |
| South Branch Solar Solar |
205 MW | Paused / redesign |
| Bluejacket Solar Solar · Hoosier Energy |
205 MW | In study |
| Energy City BESS Battery storage · Energy City BESS LLC |
205 MW | In study |
| Antlia Battery storage |
205 MW | In study |
| Saguaro Energy Storage Battery storage |
205 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)