United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTArtio Energy Storage
Artio Energy Storage is a 206 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Collin County, Texas.
Queue statusIn planning
- PlanningQueued Nov 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0349
- Grid region
- ERCOT (Texas)
- Developer
- Artio Energy Storage LLC
- Connection point (POI)
- Farmersville 345kV Substation (PSSE BUS # 1685)
- Location
- Collin County, Texas
- Technology
- Battery: 206 MW
- Total requested
- 206 MW
- Study phase
- SS Completed, FIS Completed, No IA
- Queue status
- Active
- Entered queue
- 14 November 2023
- Proposed online date
- October 2028
Location
Marker shows the centre of Collin County; the queue data does not give exact sites.
Other requests in Collin County
- Drake BESSBattery storage · 257 MW · agreement signed
- Purple Sage BESS 2Battery storage · 156 MW · agreement signed
- Purple Sage BESS 1Battery storage · 156 MW · agreement signed
- Bufflehead BESSBattery storage · 153 MW · agreement signed
- Little Ridge StorageBattery storage · 252 MW · in study
- Wigeon Whistle BESSOther · 123 MW · built
- Farmersville West BESS 2Battery storage · 9.9 MW · built
- Farmersville West BESS 1Other · 9.9 MW · built
- BRP Tigris BESSOther · 202 MW · withdrawn
- Mallard BESS IIOther · 50.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem