United States › Grid › Interconnection queues › Texas
OTHER · ERCOTFarmersville West BESS 1
Farmersville West BESS 1 is a 9.9 MW other request built and operating in the ERCOT interconnection queue, in Collin County, Texas.
Request details
- Queue ID
- 23INR0555
- Grid region
- ERCOT (Texas)
- Developer
- HEN Infrastructure, LLC 1
- Connection point (POI)
- Station Name (TDSP Station Code) = FRMRSVLW_x000D_ Load/Load Transformer Name = FRMVW_1_x000D_ PTI BUS number = 37291_x000D_ Voltage in kV = 138kV
- Location
- Collin County, Texas
- Technology
- Other: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 9 November 2022
- Agreement signed
- 7 February 2024
- Proposed online date
- June 2024
- Came online
- June 2024
Location
Marker shows the centre of Collin County; the queue data does not give exact sites.
Other requests in Collin County
- Drake BESSBattery storage · 257 MW · agreement signed
- Purple Sage BESS 2Battery storage · 156 MW · agreement signed
- Purple Sage BESS 1Battery storage · 156 MW · agreement signed
- Bufflehead BESSBattery storage · 153 MW · agreement signed
- Little Ridge StorageBattery storage · 252 MW · in study
- Artio Energy StorageBattery storage · 206 MW · in study
- Wigeon Whistle BESSOther · 123 MW · built
- Farmersville West BESS 2Battery storage · 9.9 MW · built
- BRP Tigris BESSOther · 202 MW · withdrawn
- Mallard BESS IIOther · 50.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem