OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in the USA — page 439

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown24,2054,519.8 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24,205 requests · page 439 of 485
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project AF1-244, Somerset County
Battery storage
8.0 MWWithdrawn / abandoned Somerset, MDPJM Sep 2019target 2020
Stewartstown Generating Facility
Solar
8.0 MWWithdrawn / abandoned Salem, NJPJM Dec 2009target 2010
Eversource Group @ Falmouth 993
Solar + storage
8.0 MWWithdrawn / abandoned Barnstable, MAISO-NE Apr 2020target 2023
Solar project AH1-236, Carroll County
Solar
8.0 MWWithdrawn / abandoned Carroll, OHPJM Sep 2021target 2023
Winter Drive Energy Storage
Battery storage · JERA Americas Inc.
8.0 MWWithdrawn / abandoned Erie, NYNYISO Jan 2020
BRJ
Solar
8.0 MWWithdrawn / abandoned Fresno, CACAISO Aug 2010target 2013
Solar project 680, Iron County
Solar
8.0 MWWithdrawn / abandoned Iron, UTWest Jun 2015target 2015
Solar project AA2-029, Martin County
Solar
8.0 MWWithdrawn / abandoned Martin, NCPJM Dec 2014target 2015
Solar project AG1-345, Nottoway County
Solar
8.0 MWWithdrawn / abandoned Nottoway, VAPJM Sep 2020target 2022
CHP
Gas
8.0 MWWithdrawn / abandoned Coos, NHISO-NE Apr 2017target 2018
Roy Road Solar Farm
Solar
8.0 MWWithdrawn / abandoned Warren, NJPJM Oct 2010target 2014
Empire Energy Storage
Battery storage · JERA Americas Inc.
8.0 MWWithdrawn / abandoned Monroe, NYNYISO Jan 2020
Solar
Solar
8.0 MWWithdrawn / abandoned Washington, RIISO-NE Aug 2018target 2021
Solar project Q188, Maricopa County
Solar
8.0 MWWithdrawn / abandoned Maricopa, AZWest Feb 2011target 2012
Other project G320, Marinette County
Other
8.0 MWWithdrawn / abandoned Marinette, WIMISO Mar 2003target 2005
Hydro project C4-094, Bighorn County
Hydro
8.0 MWWithdrawn / abandoned Bighorn, MTWest May 2024
Battery storage project 566674, Horry County
Battery storage
8.0 MWWithdrawn / abandoned Horry, SCSoutheast Jun 2022target 2027
Solar project 466, Camas County
Solar
8.0 MWWithdrawn / abandoned Camas, IDWest Jan 2015
Solar project W4-067, Sussex County
Solar
8.0 MWWithdrawn / abandoned Sussex, NJPJM Jan 2011target 2012
Solar project AG1-018, Washington County
Solar
8.0 MWWithdrawn / abandoned Washington, MDPJM May 2020target 2023
Valley Road Solar
Solar
8.0 MWWithdrawn / abandoned Somerset, NJPJM Jun 2011target 2013
Battery storage project AA2-063, Sussex County
Battery storage
8.0 MWWithdrawn / abandoned Sussex, NJPJM Feb 2015target 2015
Other project O61, Brunswick County
Other
8.0 MWWithdrawn / abandoned Brunswick, VAPJM Jul 2005target 2007
Solar project Y1-046, Monmouth County
Solar
8.0 MWWithdrawn / abandoned Monmouth, NJPJM Mar 2012target 2013
Allerton Road Solar Farm
Solar
8.0 MWWithdrawn / abandoned Hunterdon, NJPJM Jan 2012target 2015
EE Valley DG Group Study
Solar
8.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Nov 2023target 2026
Solar project 306, Shelby County
Solar
8.0 MWWithdrawn / abandoned Shelby, TNSoutheast Dec 2016
Solar project 769, Walla Walla County
Solar
8.0 MWWithdrawn / abandoned Walla Walla, WAWest Jul 2016target 2017
Onshore wind project G585, Redwood County
Onshore wind
8.0 MWWithdrawn / abandoned Redwood, MNMISO Dec 2005target 2008
Coal project Q50, Navajo County
Coal
8.0 MWWithdrawn / abandoned Navajo, AZWest Sep 2008target 2008
Onshore wind project G16, Northampton County
Onshore wind
8.0 MWWithdrawn / abandoned Northampton, VAPJM Apr 2001target 2002
Solar project W3-144, Warren County
Solar
8.0 MWWithdrawn / abandoned Warren, NJPJM Oct 2010target 2012
Solar project X3-085, Sussex County
Solar
8.0 MWWithdrawn / abandoned Sussex, NJPJM Oct 2011target 2013
Alpha Solar Farm
Solar
8.0 MWWithdrawn / abandoned Warren, NJPJM Jul 2010target 2014
Solar project 21764, Lenoir County
Solar
8.0 MWWithdrawn / abandoned Lenoir, NCSoutheast Oct 2018
Bradford Natural Gas Facility
Gas
8.0 MWWithdrawn / abandoned Bradford, PAPJM Oct 2014target 2016
New Village Solar Farm
Solar
8.0 MWWithdrawn / abandoned Warren, NJPJM Aug 2010target 2014
Battery storage project AA2-065, Warren County
Battery storage
8.0 MWWithdrawn / abandoned Warren, NJPJM Feb 2015target 2015
Solar project Q164, Yuma County
Solar
8.0 MWWithdrawn / abandoned Yuma, AZWest Sep 2010target 2016
Gas project AD2-111, Luzerne County
Gas
8.0 MWWithdrawn / abandoned Luzerne, PAPJM Mar 2018target 2022
Solar project AG2-257, Ocean County
Solar
8.0 MWWithdrawn / abandoned Ocean, NJPJM Mar 2021target 2022
Solar project W4-055, Warren County
Solar
8.0 MWWithdrawn / abandoned Warren, NJPJM Jan 2011target 2012
Shockoe Storage / Shockoe DP-Chatham 69 kV
Battery storage · Zenith Solar, LLC
8.0 MWWithdrawn / abandoned Fluvanna, VAPJM Mar 2020target 2022
Solar project AG2-672, Sussex County
Solar
8.0 MWWithdrawn / abandoned Sussex, DEPJM Mar 2021target 2023
Solar project X3-080, Cumberland County
Solar
8.0 MWWithdrawn / abandoned Cumberland, NJPJM Oct 2011target 2012
Solar project AH2-393, Bradford County
Solar
8.0 MWWithdrawn / abandoned Bradford, PAPJM Mar 2022target 2023
Heritage Storage
Battery storage · Invenergy Storage Development LLC
8.0 MWWithdrawn / abandoned Erie, NYNYISO Jan 2020
Solar project AE2-238, New Castle County
Solar
8.0 MWWithdrawn / abandoned New Castle, DEPJM Mar 2019target 2021
Fuel Cell
Gas
8.0 MWWithdrawn / abandoned Fairfield, CTISO-NE May 2006target 2007
Onshore wind project G0331, Harney County
Onshore wind
8.0 MWWithdrawn / abandoned Harney, ORWest Dec 2007target 2009
Page 439 of 485

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)