United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

BATTERY STORAGE Β· SOUTHEAST

Battery storage project 566674, Horry County

Battery storage project 566674, Horry County is a 8.0 MW battery storage request withdrawn in the Southeast interconnection queue, in Horry County, South Carolina, connecting to Duke Energy Progress.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
566674
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Progress
Connection point (POI)
Marion Bypass 115KV
Location
Horry County, South Carolina
Technology
Battery: 8.0 MW
Total requested
8.0 MW
Service type
Other
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
22 June 2022
Proposed online date
June 2027

Location

Marker shows the centre of Horry County; the queue data does not give exact sites.

Power plants in South Carolina Β· Transmission lines in South Carolina

Other requests in Horry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem