πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

ONSHORE WIND Β· PJM

Onshore wind project G16, Northampton County

Onshore wind project G16, Northampton County is a 8.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Northampton County, Virginia, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G16
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Connection point (POI)
Bayview 26kV (Wind)
Location
Northampton County, Virginia
Technology
Wind: 8.0 MW
Total requested
8.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
2 April 2001
Proposed online date
December 2002

Location

Marker shows the centre of Northampton County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Northampton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem