United States βΊ Grid βΊ Interconnection queues βΊ Virginia
BATTERY STORAGE Β· PJMBattery storage project X4-014, Northampton County
Battery storage project X4-014, Northampton County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Northampton County, Virginia, connecting to ODEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2011 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X4-014
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ODEC
- Connection point (POI)
- Kellam - Bayview 69kV
- Location
- Northampton County, Virginia
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 November 2011
- Proposed online date
- December 2013
- Withdrawn
- July 2012
Location
Marker shows the centre of Northampton County; the queue data does not give exact sites.
Other requests in Northampton County
- Battery storage project AH2-048, Northampton CountyBattery storage Β· 20.0 MW Β· in study
- Hecate Energy CherrydaleSolar Β· 20.0 MW Β· built
- BayviewOther Β· 0.5 MW Β· built
- Solar + storage project AF2-055, Northampton CountySolar + storage Β· 45.0 MW Β· withdrawn
- Solar project V3-061, Northampton CountySolar Β· 20.0 MW Β· withdrawn
- Solar project V2-045, Northampton CountySolar Β· 20.0 MW Β· withdrawn
- Onshore wind project X3-040, Northampton CountyOnshore wind Β· 18.0 MW Β· withdrawn
- Onshore wind project G16, Northampton CountyOnshore wind Β· 8.0 MW Β· withdrawn
- Offshore wind project X3-047, Northampton CountyOffshore wind Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem