United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Big Rock Solar Farm Battery storage |
200 MW | Agreement signed |
| Sandpiper Storage Battery storage |
200 MW | Agreement signed |
| Tanager Storage Battery storage |
200 MW | Agreement signed |
| Avocet Storage Battery storage |
200 MW | Agreement signed |
| American Kings Solar Solar + storage |
197 MW | Agreement signed |
| Sandrini Sol 1 Solar + storage |
192 MW | Agreement signed |
| Redux Solar Solar + storage |
190 MW | Agreement signed |
| Pastoria Solar Solar + storage |
187 MW | Agreement signed |
| Gaskell West Solar + storage |
187 MW | Agreement signed |
| Tracy Combined-Cycle Power Plant Gas |
185 MW | Agreement signed |
| Kettle Solar One Solar + storage |
180 MW | Agreement signed |
| Black Diamond ES2 Battery storage |
179 MW | Agreement signed |
| Lockhart Solar 2 Solar + storage |
165 MW | Agreement signed |
| Janus Solar + storage |
164 MW | Agreement signed |
| Zeta Solar + storage |
155 MW | Agreement signed |
| Crystal Flats Solar + storage |
155 MW | Agreement signed |
| Sunrise Butte Solar + storage |
150 MW | Agreement signed |
| Saloon Energy Storage Battery storage |
150 MW | Agreement signed |
| Sandstorm Wind Power Wind + storage |
150 MW | Agreement signed |
| Segs Expansion 2 Hybrid Solar + storage |
145 MW | Agreement signed |
| Jasmine Solar + storage |
141 MW | Agreement signed |
| Alta Vista Suntower Generating Station Solar + storage |
132 MW | Agreement signed |
| Montezuma II Wind + storage |
132 MW | Agreement signed |
| Leconte Energy Storage Battery storage |
125 MW | Agreement signed |
| Saddle Mountain Solar Solar |
125 MW | Agreement signed |
| Baldy Mesa 2 Solar + storage |
125 MW | Agreement signed |
| Ajo Power Bank Battery storage |
124 MW | Agreement signed |
| Los Esteros Critical Energy Facility Expansion Gas |
123 MW | Agreement signed |
| Excelsior Solar (Fka: Burford Five Points) Solar + storage |
120 MW | Agreement signed |
| Gonzaga Hybrid Wind + storage |
115 MW | Agreement signed |
| Reclaimed Wind Battery storage |
114 MW | Agreement signed |
| Serena Storage Battery storage |
114 MW | Agreement signed |
| Mulqueeney Ranch Wind Onshore wind |
114 MW | Agreement signed |
| Oakdale Storage Battery storage |
103 MW | Agreement signed |
| Los Nietos Battery storage |
102 MW | Agreement signed |
| Denali Energy Storage Battery storage |
102 MW | Agreement signed |
| Kyan Solar Solar |
102 MW | Agreement signed |
| Tokay Storage Battery storage |
102 MW | Agreement signed |
| Double Springs Energy Storage Battery storage |
101 MW | Agreement signed |
| Sunbeam Storage Battery storage |
101 MW | Agreement signed |
| Peaceful Hollow BESS Battery storage |
100 MW | Agreement signed |
| Keyhole Wind Onshore wind |
100 MW | Agreement signed |
| Golden Fields Solar Battery storage |
100 MW | Agreement signed |
| Sanborn Hybrid 4 Solar + storage |
100 MW | Agreement signed |
| Azalea Solar + storage |
99.3 MW | Agreement signed |
| Noosa Energy Storage Battery storage |
99.0 MW | Agreement signed |
| Solano 4 Wind Onshore wind |
92.4 MW | Agreement signed |
| Chalan Solar Solar + storage |
91.8 MW | Agreement signed |
| Fresno Cogeneration Expansion Project Gas |
91.8 MW | Agreement signed |
| Redwood Solar Farm Solar |
90.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- CAISO (California)235 · 96.2 GW
- West (non-ISO utilities)349 · 60.6 GW
- Southeast (non-ISO utilities)192 · 37.8 GW
- SPP (Southwest Power Pool)212 · 37.6 GW
- PJM (Mid-Atlantic, Midwest)343 · 35.0 GW
- MISO (Midcontinent)187 · 28.1 GW
- ISO-NE (New England)45 · 8,609 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)