🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Projects with signed interconnection agreements in CAISO (California) — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown23596.2 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

235 requests · page 4 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Big Rock Solar Farm
Battery storage
200 MWAgreement signed Imperial, CACAISO Apr 2015target 2025
Sandpiper Storage
Battery storage
200 MWAgreement signed Orange, CACAISO Apr 2019target 2026
Tanager Storage
Battery storage
200 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2027
Avocet Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2026
American Kings Solar
Solar + storage
197 MWAgreement signed Kings, CACAISO Nov 20072020
Sandrini Sol 1
Solar + storage
192 MWAgreement signed Kern, CACAISO May 2017target 2025
Redux Solar
Solar + storage
190 MWAgreement signed Fresno, CACAISO May 2017target 2026
Pastoria Solar
Solar + storage
187 MWAgreement signed Kern, CACAISO May 2016target 2026
Gaskell West
Solar + storage
187 MWAgreement signed Kern, CACAISO Apr 2014target 2026
Tracy Combined-Cycle Power Plant
Gas
185 MWAgreement signed San Joaquin, CACAISO Oct 20072012
Kettle Solar One
Solar + storage
180 MWAgreement signed San Diego, CACAISO Apr 2018target 2026
Black Diamond ES2
Battery storage
179 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2031
Lockhart Solar 2
Solar + storage
165 MWAgreement signed San Bernardino, CACAISO Apr 2019target 2026
Janus
Solar + storage
164 MWAgreement signed Colusa, CACAISO Apr 2018target 2026
Zeta
Solar + storage
155 MWAgreement signed Merced, CACAISO Apr 2020target 2027
Crystal Flats
Solar + storage
155 MWAgreement signed Kern, CACAISO Apr 2020target 2030
Sunrise Butte
Solar + storage
150 MWAgreement signed Imperial, CACAISO Apr 2019target 2029
Saloon Energy Storage
Battery storage
150 MWAgreement signed Colusa, CACAISO Apr 2018target 2027
Sandstorm Wind Power
Wind + storage
150 MWAgreement signed Riverside, CACAISO Oct 2006target 2030
Segs Expansion 2 Hybrid
Solar + storage
145 MWAgreement signed San Bernardino, CACAISO Apr 2020target 2026
Jasmine
Solar + storage
141 MWAgreement signed Kern, CACAISO Apr 2018target 2026
Alta Vista Suntower Generating Station
Solar + storage
132 MWAgreement signed Los Angeles, CACAISO Jan 20082013
Montezuma II
Wind + storage
132 MWAgreement signed Solano, CACAISO May 20072012
Leconte Energy Storage
Battery storage
125 MWAgreement signed Imperial, CACAISO Apr 2015target 2026
Saddle Mountain Solar
Solar
125 MWAgreement signed Maricopa, AZCAISO Apr 2020target 2025
Baldy Mesa 2
Solar + storage
125 MWAgreement signed San Bernardino, CACAISO Apr 2018target 2026
Ajo Power Bank
Battery storage
124 MWAgreement signed Santa Clara, CACAISO Apr 2018target 2028
Los Esteros Critical Energy Facility Expansion
Gas
123 MWAgreement signed Santa Clara, CACAISO May 2008target 2023
Excelsior Solar (Fka: Burford Five Points)
Solar + storage
120 MWAgreement signed Fresno, CACAISO Mar 20112016
Gonzaga Hybrid
Wind + storage
115 MWAgreement signed Merced, CACAISO Apr 2020target 2026
Reclaimed Wind
Battery storage
114 MWAgreement signed Alameda, CACAISO Apr 2018target 2026
Serena Storage
Battery storage
114 MWAgreement signed Kern, CACAISO Apr 2021target 2029
Mulqueeney Ranch Wind
Onshore wind
114 MWAgreement signed Alameda, CACAISO May 2016target 2026
Oakdale Storage
Battery storage
103 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2029
Los Nietos
Battery storage
102 MWAgreement signed Orange, CACAISO Apr 2021target 2031
Denali Energy Storage
Battery storage
102 MWAgreement signed San Joaquin, CACAISO Apr 2020target 2028
Kyan Solar
Solar
102 MWAgreement signed Kern, CACAISO May 2016target 2027
Tokay Storage
Battery storage
102 MWAgreement signed Santa Clara, CACAISO Apr 2021target 2030
Double Springs Energy Storage
Battery storage
101 MWAgreement signed Calaveras, CACAISO Apr 2021target 2029
Sunbeam Storage
Battery storage
101 MWAgreement signed San Mateo, CACAISO Apr 2021target 2034
Peaceful Hollow BESS
Battery storage
100 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Keyhole Wind
Onshore wind
100 MWAgreement signed Kern, CACAISO Apr 2020target 2028
Golden Fields Solar
Battery storage
100 MWAgreement signed Kern, CACAISO Apr 2015target 2026
Sanborn Hybrid 4
Solar + storage
100 MWAgreement signed Kern, CACAISO Apr 2020target 2025
Azalea
Solar + storage
99.3 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Noosa Energy Storage
Battery storage
99.0 MWAgreement signed San Joaquin, CACAISO Apr 2019target 2029
Solano 4 Wind
Onshore wind
92.4 MWAgreement signed Solano, CACAISO Apr 2018target 2025
Chalan Solar
Solar + storage
91.8 MWAgreement signed Kern, CACAISO Apr 2018target 2026
Fresno Cogeneration Expansion Project
Gas
91.8 MWAgreement signed Fresno, CACAISO Mar 20052007
Redwood Solar Farm
Solar
90.0 MWAgreement signed Kern, CACAISO Mar 2011target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)