OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in the USA (2020 requests) โ€” page 30

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,752246.2 GW
Active in queue117.0 GW635 requests
Agreement signed57.7 GW326 requests
Withdrawn1,752246.2 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,752 requests ยท page 30 of 36
ProjectCapacityStatusLocationRegionQueuedOnline
Downsville Solar
Solar
16.0 MWWithdrawn / abandoned Washington, MDPJM Aug 2020target 2022
Solar
Solar
16.0 MWWithdrawn / abandoned Hillsborough, NHISO-NE Apr 2020target 2024
Gas project 64628, Wayne County
Gas ยท Duke Energy Progress, LLC
16.0 MWWithdrawn / abandoned Wayne, NCSoutheast Jan 2020
Solar project AG1-467, Orange County
Solar
15.6 MWWithdrawn / abandoned Orange, VAPJM Sep 2020target 2022
Solar + storage project AG1-481, Warren County
Solar + storage
15.5 MWWithdrawn / abandoned Warren, PAPJM Sep 2020target 2024
Solar project AF2-206, Monmouth County
Solar
15.4 MWWithdrawn / abandoned Monmouth, NJPJM Mar 2020target 2021
Solar project AG1-392B, Potter County
Solar ยท PO-Cowburn LLC
15.0 MWWithdrawn / abandoned Potter, PAPJM Oct 2020target 2022
Solar project AF2-064, Warren County
Solar
15.0 MWWithdrawn / abandoned Warren, NJPJM Jan 2020target 2020
Battery storage project AG1-211, Mecklenburg County
Battery storage
15.0 MWWithdrawn / abandoned Mecklenburg, VAPJM Sep 2020target 2022
Minisink Valley Solar
Solar ยท Minisink Valley Solar 1, LLC
15.0 MWWithdrawn / abandoned Orange, NYNYISO Aug 2020
NW-Rocky Ford Solar
Solar ยท NW-Rocky Ford LLC
15.0 MWWithdrawn / abandoned Nottoway, VAPJM Sep 2020target 2021
Orrtanna
Battery storage
15.0 MWWithdrawn / abandoned Adams, PAPJM Sep 2020target 2027
Big Pond Solar Power Plant
Solar
15.0 MWWithdrawn / abandoned Bradford, PAPJM Mar 2020target 2022
Solar project AG1-392C, Potter County
Solar ยท PO-Cowburn LLC
15.0 MWWithdrawn / abandoned Potter, PAPJM Oct 2020target 2022
Solar project AF2-244, Powhatan County
Solar
15.0 MWWithdrawn / abandoned Powhatan, VAPJM Mar 2020target 2023
Solar project AG1-287, Halifax County
Solar
15.0 MWWithdrawn / abandoned Halifax, VAPJM Sep 2020target 2022
Solar project AF2-114, Jefferson County
Solar
15.0 MWWithdrawn / abandoned Jefferson, WVPJM Feb 2020target 2022
Richardson Solar
Solar
15.0 MWWithdrawn / abandoned Clarion, PAPJM Mar 2020target 2027
Solar project AF2-386, Williams County
Solar
15.0 MWWithdrawn / abandoned Williams, OHPJM Mar 2020target 2022
Solar project AG1-475, Gloucester County
Solar
15.0 MWWithdrawn / abandoned Gloucester, NJPJM Sep 2020target 2023
Solar project AG1-016, Warren County
Solar
15.0 MWWithdrawn / abandoned Warren, NJPJM May 2020target 2020
Solar project AG1-169, Nottoway County
Solar ยท NW-Rocky Ford LLC
15.0 MWWithdrawn / abandoned Nottoway, VAPJM Sep 2020target 2021
Pearl Solar
Solar
15.0 MWWithdrawn / abandoned Venango, PAPJM Mar 2020target 2026
Battery storage project AG2-019, Mecklenburg County
Battery storage
15.0 MWWithdrawn / abandoned Mecklenburg, VAPJM Oct 2020target 2022
NW-Rocky Ford Solar
Solar ยท NW-Rocky Ford LLC
15.0 MWWithdrawn / abandoned Nottoway, VAPJM Sep 2020target 2021
Independence Solar Farm
Solar
15.0 MWWithdrawn / abandoned Warren, NJPJM Jul 2020target 2027
Solar project AF2-373, Halifax County
Solar
14.3 MWWithdrawn / abandoned Halifax, VAPJM Mar 2020target 2022
SH-Mehrrin Solar
Solar ยท SH-Mehrrin LLC
14.2 MWWithdrawn / abandoned Southampton, VAPJM Sep 2020target 2022
Solar project AG1-468, Henry County
Solar
14.0 MWWithdrawn / abandoned Henry, VAPJM Sep 2020target 2022
Solar project AG1-459, Washington County
Solar
14.0 MWWithdrawn / abandoned Washington, MDPJM Sep 2020target 2023
Battery storage project AG1-215, Nottoway County
Battery storage
14.0 MWWithdrawn / abandoned Nottoway, VAPJM Sep 2020target 2022
Gas project 64626, Wayne County
Gas ยท Duke Energy Progress, LLC
14.0 MWWithdrawn / abandoned Wayne, NCSoutheast Jan 2020
Solar project AG1-466, Orange County
Solar
14.0 MWWithdrawn / abandoned Orange, VAPJM Sep 2020target 2022
Solar project AG1-036, Bertie County
Solar
13.5 MWWithdrawn / abandoned Bertie, NCPJM Jun 2020target 2021
Kent County - NG WRI DG Area Study #2 <5 MW
Solar
13.5 MWWithdrawn / abandoned Kent, RIISO-NE Aug 2020target 2022
Solar project AF2-148, Huntingdon County
Solar
13.5 MWWithdrawn / abandoned Huntingdon, PAPJM Mar 2020target 2023
Solar project AG1-190, Burlington County
Solar
13.2 MWWithdrawn / abandoned Burlington, NJPJM Sep 2020target 2021
Solar project AF2-147, Mifflin County
Solar
13.1 MWWithdrawn / abandoned Mifflin, PAPJM Mar 2020target 2023
Gas project AF2-155, Prince George's County
Gas
13.0 MWWithdrawn / abandoned Prince George's, MDPJM Mar 2020target 2021
Solar project AG2-060, Luzerne County
Solar
12.6 MWWithdrawn / abandoned Luzerne, PAPJM Dec 2020target 2022
Eversource Group Study @ Blandford
Solar
12.5 MWWithdrawn / abandoned Hampden, MAISO-NE Apr 2020target 2023
Eversource Group @ Bell Rock #661
Solar + storage
12.0 MWWithdrawn / abandoned Bristol, MAISO-NE Jun 2020target 2023
Magenta Solar
Solar
12.0 MWWithdrawn / abandoned Bedford, PAPJM Feb 2020target 2026
Salt Solar
Solar
12.0 MWWithdrawn / abandoned Bedford, PAPJM Jun 2020target 2026
Gas project 63806, Wayne County
Gas ยท Duke Energy Progress, LLC
12.0 MWWithdrawn / abandoned Wayne, NCSoutheast Jan 2020
Emsworth Back Channel Dam Hydroelectric Project
Hydro
12.0 MWWithdrawn / abandoned Allegheny, PAPJM Mar 2020target 2024
Eversource Group @ Sandwich 916
Solar + storage
11.8 MWWithdrawn / abandoned Barnstable, MAISO-NE Apr 2020target 2023
Solar
Solar
11.8 MWWithdrawn / abandoned Washington, MEISO-NE Sep 2020target 2023
Replace 11.4 of WPS.LAKEFRN96 Unit with natural gas (with diesel as a backup); Lakefront 9
Gas
11.4 MWWithdrawn / abandoned Manitowoc, WIMISO Jul 2020target 2022
Eversource Group Study @ Industrial Park
Solar + storage
11.3 MWWithdrawn / abandoned Bristol, MAISO-NE Mar 2020target 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)