United States › Grid › Interconnection queues › Wisconsin
GAS · MISOReplace 11.4 of WPS.LAKEFRN96 Unit with natural gas (with diesel as a backup); Lakefront 9
Replace 11.4 of WPS.LAKEFRN96 Unit with natural gas (with diesel as a backup); Lakefront 9 is a 11.4 MW gas request withdrawn in the MISO interconnection queue, in Manitowoc County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R1002
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- Lake Front 69KV
- Location
- Manitowoc County, Wisconsin
- Technology
- Gas: 11.4 MW · Other
- Total requested
- 11.4 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 1 July 2020
- Proposed online date
- July 2022
Location
Marker shows the centre of Manitowoc County; the queue data does not give exact sites.
Other requests in Manitowoc County
- Solar project J886, Manitowoc CountySolar · 150 MW · built
- Solar project J505, Manitowoc CountySolar · 99.0 MW · built
- Gas project G240, Manitowoc CountyGas · 55.0 MW · built
- Nuclear project G834, Manitowoc CountyNuclear · 53.0 MW · built
- Nuclear project G833, Manitowoc CountyNuclear · 53.0 MW · built
- Nuclear project J022, Manitowoc CountyNuclear · 6.0 MW · built
- Nuclear project J023, Manitowoc CountyNuclear · 6.0 MW · built
- Gas project J383, Manitowoc CountyGas · 571 MW · withdrawn
- Onshore wind project J094, Manitowoc CountyOnshore wind · 200 MW · withdrawn
- Battery storage project J2218, Manitowoc CountyBattery storage · 150 MW · withdrawn
- Onshore wind project J657, Manitowoc CountyOnshore wind · 101 MW · withdrawn
- Onshore wind project G384, Manitowoc CountyOnshore wind · 99.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem