ONSHORE WIND Β· MISO

Onshore wind project J657, Manitowoc County

Onshore wind project J657, Manitowoc County is a 101 MW onshore wind request withdrawn in the MISO interconnection queue, in Manitowoc County, Wisconsin, connecting to American Transmission Co..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2016 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J657
Grid region
MISO (Midcontinent)
Utility / transmission owner
American Transmission Co.
Connection point (POI)
Kewaunee - Shoto 138kV Line (at the existing Mishicot Tap)
Location
Manitowoc County, Wisconsin
Technology
Wind: 101 MW
Total requested
101 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
8 July 2016
Proposed online date
September 2019
Withdrawn
April 2018

Location

Marker shows the centre of Manitowoc County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Manitowoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem