United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project G384, Manitowoc County

Onshore wind project G384, Manitowoc County is a 99.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Manitowoc County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G384
Grid region
MISO (Midcontinent)
Connection point (POI)
Mishicot 138 kV substation
Location
Manitowoc County, Wisconsin
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
8 December 2003
Agreement signed
11 January 2006
Proposed online date
July 2007

Location

Marker shows the centre of Manitowoc County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Manitowoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem