United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
GAS Β· SOUTHEASTGas project 63806, Wayne County
Gas project 63806, Wayne County is a 12.0 MW gas request withdrawn in the Southeast interconnection queue, in Wayne County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 63806
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Progress, LLC
- Connection point (POI)
- Lee 230 kV
- Location
- Wayne County, North Carolina
- Technology
- Gas: 12.0 MW
- Total requested
- 12.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 20 January 2020
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Wayne County
- Battery storage project 897163, Wayne CountyBattery storage Β· 260 MW Β· agreement signed
- Solar project 569890, Wayne CountySolar Β· 80.0 MW Β· agreement signed
- Solar project 920659, Wayne CountySolar Β· 67.0 MW Β· agreement signed
- Gas project PP00012, Wayne CountyGas Β· 26.0 MW Β· agreement signed
- Gas project 904269, Wayne CountyGas Β· 26.0 MW Β· agreement signed
- Gas project PP00011, Wayne CountyGas Β· 20.0 MW Β· agreement signed
- Gas project 899581, Wayne CountyGas Β· 20.0 MW Β· agreement signed
- Battery storage project PP00027, Wayne CountyBattery storage Β· 260 MW Β· in study
- Battery storage project PP00028, Wayne CountyBattery storage Β· 150 MW Β· in study
- Battery storage project 956161, Wayne CountyBattery storage Β· 150 MW Β· in study
- Solar project 977272, Wayne CountySolar Β· 80.0 MW Β· in study
- Other project PP00037, Wayne CountyOther Β· 67.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem