SOLAR · PJMBig Pond Solar Power Plant
Big Pond Solar Power Plant is a 15.0 MW solar request withdrawn in the PJM interconnection queue, in Bradford County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- ConsentedMay 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-265
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- South Troy-Athens 34.5 kV
- Location
- Bradford County, Pennsylvania
- Technology
- Solar: 15.0 MW
- Total requested
- 15.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 27 March 2020
- Agreement signed
- 7 May 2021
- Proposed online date
- September 2022
- Withdrawn
- August 2023
Location
Marker shows the centre of Bradford County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Bradford County
- Farmers Valley SolarSolar · 20.0 MW · agreement signed
- Gas project AI2-022, Bradford CountyGas · 60.0 MW · in study
- Solar project AG2-356, Bradford CountySolar · 20.0 MW · in study
- Solar project AH2-036, Bradford CountySolar · 5.0 MW · in study
- Liberty/Asylum Township PlantGas · 850 MW · built
- Armenia Mountain WFOnshore wind · 100 MW · built
- Liberty/Asylum Township PlantGas · 57.5 MW · built
- Beaver Dam Generating StationGas · 19.9 MW · built
- Wyalusing 34.5kVGas · 19.9 MW · built
- Glory Barn Road Generating Facility AlpacaGas · 19.9 MW · built
- North Tier LFOther · 1.6 MW · built
- Wyalusing 34.5 kVGas · 1.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem