United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMDownsville Solar
Downsville Solar is a 16.0 MW solar request withdrawn in the PJM interconnection queue, in Washington County, Maryland, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-095
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- General Office-Rustoleum 34.5 kV
- Location
- Washington County, Maryland
- Technology
- Solar: 16.0 MW
- Total requested
- 16.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 14 August 2020
- Proposed online date
- September 2022
- Withdrawn
- August 2023
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- East Hagerstown SolarSolar Β· 11.8 MW Β· agreement signed
- Battery storage project AI2-311, Washington CountyBattery storage Β· 30.0 MW Β· in study
- Lappans 34.5kV ProjectSolar Β· 20.0 MW Β· built
- Hagerstown PlantSolar Β· 10.0 MW Β· built
- Pinesburg Solar ProjectSolar Β· 4.3 MW Β· built
- Battery storage project AG1-470, Washington CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project AG1-458, Washington CountySolar Β· 40.0 MW Β· withdrawn
- Solar project AF2-357, Washington CountySolar Β· 24.0 MW Β· withdrawn
- Solar project AG2-078, Washington CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AG2-279, Washington CountySolar Β· 20.0 MW Β· withdrawn
- Mason Dixon Solar Center FacilitySolar Β· 18.4 MW Β· withdrawn
- Route 632 Washington Solar FacilitySolar Β· 16.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem