πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

SOLAR Β· PJM

Solar project AG2-279, Washington County

Solar project AG2-279, Washington County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Washington County, Maryland, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-279
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Developer
Franklin Energy, LLC
Connection point (POI)
Hagerstown-Conservit 34.5 kV
Location
Washington County, Maryland
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
3 February 2025
Proposed online date
September 2024
Withdrawn
November 2025

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem