United States › Grid › Interconnection queues › Maryland
BATTERY STORAGE · PJMBattery storage project AI2-311, Washington County
Battery storage project AI2-311, Washington County is a 30.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Washington County, Maryland, connecting to APS.
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-311
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Ringgold 138 kV II
- Location
- Washington County, Maryland
- Technology
- Battery: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 2 March 2023
- Proposed online date
- January 2025
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- East Hagerstown SolarSolar · 11.8 MW · agreement signed
- Lappans 34.5kV ProjectSolar · 20.0 MW · built
- Hagerstown PlantSolar · 10.0 MW · built
- Pinesburg Solar ProjectSolar · 4.3 MW · built
- Battery storage project AG1-470, Washington CountyBattery storage · 50.0 MW · withdrawn
- Solar project AG1-458, Washington CountySolar · 40.0 MW · withdrawn
- Solar project AF2-357, Washington CountySolar · 24.0 MW · withdrawn
- Solar project AG2-078, Washington CountySolar · 20.0 MW · withdrawn
- Solar project AG2-279, Washington CountySolar · 20.0 MW · withdrawn
- Mason Dixon Solar Center FacilitySolar · 18.4 MW · withdrawn
- Downsville SolarSolar · 16.0 MW · withdrawn
- Route 632 Washington Solar FacilitySolar · 16.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem