🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

OCTARY USA · INTERCONNECTION QUEUES

Projects with signed interconnection agreements in California — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown21581.7 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

215 requests · page 3 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Captiva Energy Storage
Battery storage
257 MWAgreement signed Orange, CACAISO Apr 2020target 2028
Commerce Energy Storage 3
Battery storage
256 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Ciervo Mountain Hybrid
Solar + storage
255 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Sandrift Storage 1
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sandrift Storage 2
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
North Rosamond Solar
Solar + storage
253 MWAgreement signed Kern, CACAISO Jul 20102019
Greenwood Energy Storage
Battery storage
252 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2032
Zorin Storage
Battery storage
252 MWAgreement signed Alameda, CACAISO Apr 2021target 2034
Solar project Company NR, Lassen County
Solar
250 MWAgreement signed Lassen, CAWest Sep 2022target 2030
Commerce Energy Storage
Battery storage
250 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2026
Baylands Battery
Battery storage
250 MWAgreement signed San Mateo, CACAISO Apr 2021target 2030
Cormorant Storage
Battery storage
250 MWAgreement signed San Francisco, CACAISO Apr 2019target 2027
Windstar I Alternate
Wind + storage
240 MWAgreement signed Kern, CACAISO Apr 20062012
Midway Peaking
Gas
240 MWAgreement signed Fresno, CACAISO Jan 20052009
Sapphire Solar
Solar + storage
234 MWAgreement signed Riverside, CACAISO Apr 2020target 2034
Heartland 2
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Heartland 1
Solar + storage
228 MWAgreement signed Fresno, CACAISO May 2017target 2028
Baldy Mesa
Solar + storage
225 MWAgreement signed San Bernardino, CACAISO May 2017target 2026
Allium Hybrid
Solar + storage
225 MWAgreement signed San Benito, CACAISO Apr 2021target 2030
Dorian Storage
Battery storage
214 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2034
Zeus BESS
Battery storage
214 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Desert Jewel Storage
Battery storage
206 MWAgreement signed San Diego, CACAISO Apr 2021target 2029
Fountain Wind
Onshore wind
206 MWAgreement signed Shasta, CACAISO Apr 2015target 2027
Huaso Hybrid
Solar + storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2026
Seahawk Storage
Battery storage
204 MWAgreement signed Santa Cruz, CACAISO Apr 2021target 2029
Cougar Storage
Battery storage
204 MWAgreement signed Merced, CACAISO Apr 2021target 2030
Apache Storage
Battery storage
204 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Kingsroad Hybrid Solar
Solar + storage
204 MWAgreement signed Kern, CACAISO Apr 2019target 2028
Little Bear 4
Solar + storage
203 MWAgreement signed Fresno, CACAISO Apr 20152020
Aramis Power Plant
Solar + storage
203 MWAgreement signed Alameda, CACAISO May 2017target 2026
Las Camas 3
Solar + storage
203 MWAgreement signed Merced, CACAISO Apr 2018target 2027
Las Camas 1
Solar + storage
203 MWAgreement signed Merced, CACAISO May 2017target 2027
Kestrel Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2027
Big Rock Solar Farm
Battery storage
200 MWAgreement signed Imperial, CACAISO Apr 2015target 2025
Sandpiper Storage
Battery storage
200 MWAgreement signed Orange, CACAISO Apr 2019target 2026
Tanager Storage
Battery storage
200 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2027
Avocet Storage
Battery storage
200 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2026
American Kings Solar
Solar + storage
197 MWAgreement signed Kings, CACAISO Nov 20072020
Sandrini Sol 1
Solar + storage
192 MWAgreement signed Kern, CACAISO May 2017target 2025
Redux Solar
Solar + storage
190 MWAgreement signed Fresno, CACAISO May 2017target 2026
Pastoria Solar
Solar + storage
187 MWAgreement signed Kern, CACAISO May 2016target 2026
Gaskell West
Solar + storage
187 MWAgreement signed Kern, CACAISO Apr 2014target 2026
Tracy Combined-Cycle Power Plant
Gas
185 MWAgreement signed San Joaquin, CACAISO Oct 20072012
Kettle Solar One
Solar + storage
180 MWAgreement signed San Diego, CACAISO Apr 2018target 2026
Black Diamond ES2
Battery storage
179 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2031
Lockhart Solar 2
Solar + storage
165 MWAgreement signed San Bernardino, CACAISO Apr 2019target 2026
Janus
Solar + storage
164 MWAgreement signed Colusa, CACAISO Apr 2018target 2026
Zeta
Solar + storage
155 MWAgreement signed Merced, CACAISO Apr 2020target 2027
Crystal Flats
Solar + storage
155 MWAgreement signed Kern, CACAISO Apr 2020target 2030
Sunrise Butte
Solar + storage
150 MWAgreement signed Imperial, CACAISO Apr 2019target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)