United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in California, CAISO — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lake Elsinore Advanced Pumped Storage Project Battery storage |
500 MW | Agreement signed |
| Calvada Springs Solar Solar + storage |
500 MW | Agreement signed |
| Goldback Solar Center Battery storage |
500 MW | Agreement signed |
| Hawkins Solar Hybrid Solar + storage |
500 MW | In study |
| Cantus Solar + storage |
499 MW | In study |
| Pluot Solar + storage |
479 MW | Agreement signed |
| Pomegranate Solar + storage |
479 MW | Agreement signed |
| Big SKY Solar Solar + storage |
476 MW | Agreement signed |
| Corby 2 Battery storage |
476 MW | In study |
| Shoals Energy Storage 2 Battery storage |
461 MW | In study |
| Mineral King Solar Solar + storage |
430 MW | In study |
| Boulder Brush Hybrid Wind + storage |
420 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| Whiskey Diggings Solar |
414 MW | In study |
| Elysian Solar + storage |
412 MW | Agreement signed |
| Dos Palmas Battery storage |
411 MW | Agreement signed |
| Shoals Energy Storage Battery storage |
409 MW | Agreement signed |
| Solstice C Solar + storage |
408 MW | In study |
| Hidalgo Energy Storage Battery storage |
408 MW | Agreement signed |
| Solstice D Solar + storage |
408 MW | In study |
| Clarkson Solar + storage |
408 MW | Agreement signed |
| Maravillosa 1 Solar + storage |
407 MW | In study |
| Lotus Solar 2 Solar + storage |
406 MW | In study |
| Simon Battery storage |
406 MW | In study |
| Gabriel Storage Battery storage |
406 MW | Agreement signed |
| Trolley Battery storage |
406 MW | Agreement signed |
| Coral Reef Battery storage |
406 MW | In study |
| Fleetwood Battery storage |
406 MW | In study |
| Marici Battery storage |
406 MW | Agreement signed |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Dirac Battery storage |
403 MW | In study |
| Mount Laguna Wind 2 Onshore wind |
400 MW | Agreement signed |
| Driftwood Stella Solar + storage |
400 MW | Agreement signed |
| Gamay Solar + storage |
400 MW | In study |
| Aratina Solar Center 2 Solar + storage |
400 MW | Agreement signed |
| Sequoia Solar + storage |
400 MW | In study |
| Brushy Battery storage |
400 MW | In study |
| Rexford 2 Solar Farm Solar + storage |
400 MW | Agreement signed |
| Aratina Solar Center 1 Solar + storage |
400 MW | Agreement signed |
| Sienna Solar Farm Solar + storage |
400 MW | Agreement signed |
| Comstock Gas |
398 MW | In study |
| Sonrisa Solar + storage |
384 MW | Agreement signed |
| MidBishop Solar + storage |
382 MW | In study |
| Brown Bear Solar + storage |
378 MW | In study |
| Luna Valley Solar Solar + storage |
373 MW | Agreement signed |
| Circinus Solar + storage |
371 MW | In study |
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Northeast Central Valley Battery storage |
365 MW | In study |
| Jewelflower Storage Battery storage |
355 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)