United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 29

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 29 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Patientia Energy
Battery storage
100 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Mabu BESS
Battery storage
100 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2019target 2023
Bierstadt Energy Storage
Battery storage
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2024
Trim BESS
Battery storage
100 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2019target 2023
Eucalyptus Storage
Battery storage
100 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Royal Solar Project
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2018
Alta 8
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Dec 2006target 2014
PV Redman-Piute
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
Pintail Energy Storage
Battery storage
100 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2018target 2021
PV Little Rock-Palmdale
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
PV Piute-Lancaster
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
Golden Fields Solar 3
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
PV Coolwater - Kramer
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
Midtown Canyon Es
Battery storage
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Lucerne Valley 100 MW PV Plant
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2015
Desert Harvest Solar Farm
Solar
100 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
Temettate Advanced Caes
Battery storage
100 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2018target 2024
Enrico Matson III
Solar
100 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
Vermillion
Solar
100 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2017
Spring Mountain Solar
Solar
100 MWWithdrawn / abandoned Nye, NVCAISO Apr 2014target 2017
PV Kramer-Inyokern #2
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
PV Goldtown-Lancaster
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
Csed Barstow Road 100 MW PV Generating Station
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2014
Snow Mountain Solar
Solar
100 MWWithdrawn / abandoned Clark, NVCAISO Apr 2015target 2019
Sunway BESS
Battery storage
100 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Baker Solar I
Solar
100 MWWithdrawn / abandoned Riverside, CACAISO Jun 2008target 2010
Alta Q153 (Fka Alta 7)
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Nov 2006target 2016
Tecate Hybrid
Solar + storage
100 MWWithdrawn / abandoned San Diego, CACAISO Jun 2006target 2022
Lucerne Solar Energy - C5
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2015
Bellota Solar Farm
Solar
100 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2011target 2014
PV Goldtown-Corum
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
PV Palmdale-Tortoise
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
Ne Wind Project
Onshore wind
100 MWWithdrawn / abandoned Plumas, CACAISO Mar 2008target 2013
PV Redman-Lancaster
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
San Joaquin Solar
Solar
100 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2011target 2014
Carquinez Wind
Onshore wind
100 MWWithdrawn / abandoned Contra Costa, CACAISO Feb 2007target 2011
Las Camas 4
Battery storage
100 MWWithdrawn / abandoned Merced, CACAISO Apr 2021target 2028
PV Rosamond-Antelope
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
PV Rosamond-Corum
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
Lompoc Wind Project II
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2006target 2009
Alta 10
Onshore wind
100 MWWithdrawn / abandoned Kern, CACAISO Dec 2006target 2013
Gabriel Solar 3
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO May 2017target 2019
Chanson Energy Storage Facility
Battery storage
100 MWWithdrawn / abandoned Calaveras, CACAISO May 2017target 2020
Dunnigan Hills
Onshore wind
100 MWWithdrawn / abandoned Yolo, CACAISO Apr 2012target 2013
Rmu Plant
Gas
100 MWWithdrawn / abandoned Kern, CACAISO Apr 2006target 2008
PV Kramer-Inyokern #1
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
FRV Leo Solar
Solar
100 MWWithdrawn / abandoned Merced, CACAISO Feb 2010target 2013
PV Piute-Little Rock
Solar
100 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2008target 2009
Bolthouse Solar (Fka Pumpjack Solar)
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
PV Tortilla-Kramer
Solar
100 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2009
Page 29 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)