United States βΊ Grid βΊ Interconnection queues βΊ California
BATTERY STORAGE Β· CAISOEucalyptus Storage
Eucalyptus Storage is a 100 MW battery storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54845
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Miller 115kV line #1
- Location
- California
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- July 2029
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Golden FlatsBattery storage Β· 365 MW Β· agreement signed
- Oakdale StorageBattery storage Β· 103 MW Β· agreement signed
- Crow Creek Solar 1 (Fka: Frontier Solar 1) (Fka As Scatec Westside Solar Ranch I And Stanislaus PV - Phase 1)Solar + storage Β· 40.0 MW Β· agreement signed
- AmaneceSolar + storage Β· 836 MW Β· in study
- GerasSolar + storage Β· 268 MW Β· in study
- Proxima SolarSolar + storage Β· 352 MW Β· built
- Central 40Solar Β· 40.0 MW Β· built
- Paulsell Solar Energy CenterSolar + storage Β· 35.0 MW Β· built
- HadselvilleSolar + storage Β· 816 MW Β· withdrawn
- Amanece SolarSolar + storage Β· 420 MW Β· withdrawn
- Mountain Valley StorageBattery storage Β· 306 MW Β· withdrawn
- Grape Valley StorageBattery storage Β· 306 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem