ONSHORE WIND · CAISO

Lompoc Wind Project II

Lompoc Wind Project II is a 100 MW onshore wind request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2006 (completed)
  2. Withdrawn / abandonedJul 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
102A
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cabrill0-Divide 115kV
Location
Kern County, California
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
21 April 2006
Proposed online date
December 2009
Withdrawn
July 2011

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem