FRV Leo Solar

FRV Leo Solar is a 100 MW solar request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedNov 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
560
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Banos-Dos Amigos 230kV
Location
Merced County, California
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
March 2013
Withdrawn
November 2013

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.