United States › Grid › Interconnection queues › California

SOLAR · CAISO

Bolthouse Solar (Fka Pumpjack Solar)

Bolthouse Solar (Fka Pumpjack Solar) is a 100 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
743
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Morrow Bay - Midway #1 & #2 230 KV
Location
Kern County, California
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
May 2015
Withdrawn
April 2012

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem