United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2018 requests) โ page 26
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AE1-125, Shenandoah County Solar |
18.9 MW | Withdrawn / abandoned |
| John Paul Jones Gas ยท Dflex Power |
18.6 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2018-070, Yankton County Onshore wind |
18.3 MW | Withdrawn / abandoned |
| Palmer Substation - NG Western MA Area Cluster Study Solar |
18.1 MW | Withdrawn / abandoned |
| Solar project AE2-030, Allegany County Solar |
18.0 MW | Withdrawn / abandoned |
| Kernridge Expansion Solar |
17.9 MW | Withdrawn / abandoned |
| Belcher Solar Solar |
17.0 MW | Withdrawn / abandoned |
| Solar project AD2-041, Whiteside County Solar |
17.0 MW | Withdrawn / abandoned |
| Solar project Q294, Yavapai County Solar |
17.0 MW | Withdrawn / abandoned |
| Gas project J1141, Manistee County Gas |
17.0 MW | Withdrawn / abandoned |
| Solar project 349, Pontotoc County Solar |
17.0 MW | Withdrawn / abandoned |
| Endless Caverns Solar Solar |
15.7 MW | Withdrawn / abandoned |
| Endless Caverns Solar Solar |
15.7 MW | Withdrawn / abandoned |
| Solar project 15376, Chester County Solar |
15.0 MW | Withdrawn / abandoned |
| Battery storage project J1037, Murray County Battery storage |
15.0 MW | Withdrawn / abandoned |
| Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Battery storage project AD2-128, Fayette County Battery storage |
15.0 MW | Withdrawn / abandoned |
| Godwin Blvd Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Astoria Storage on Demand Battery storage ยท Consolidated Edison Company of NY, Inc. |
15.0 MW | Withdrawn / abandoned |
| Solar project AD2-082, Prince Edward County Solar |
15.0 MW | Withdrawn / abandoned |
| Davenport Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Solar project AD2-117, Berks County Solar |
15.0 MW | Withdrawn / abandoned |
| Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Fuel Cell Other |
14.8 MW | Withdrawn / abandoned |
| Gas project IC-738, Spalding County Gas |
14.5 MW | Withdrawn / abandoned |
| Solar Solar |
14.0 MW | Withdrawn / abandoned |
| Solar project G0601, Morrow County Solar |
14.0 MW | Withdrawn / abandoned |
| Solar project AD2-200, Mecklenburg County Solar |
14.0 MW | Withdrawn / abandoned |
| Other project AD2-103, Baltimore County Other |
14.0 MW | Withdrawn / abandoned |
| Lashaway Substation - NG Western MA Area Cluster Study Solar |
13.7 MW | Withdrawn / abandoned |
| Meadow Street 552 Substation - NG Western MA Area Cluster Study Solar |
13.4 MW | Withdrawn / abandoned |
| Ware Substation - NG Western MA Area Cluster Study Solar |
13.3 MW | Withdrawn / abandoned |
| Thorndike Substation - NG Western MA Area Cluster Study Solar |
12.4 MW | Withdrawn / abandoned |
| Barre substation - NG Western MA Area Cluster Study Solar |
12.4 MW | Withdrawn / abandoned |
| Solar project AD2-187, City Of Chesapeake County Solar |
12.0 MW | Withdrawn / abandoned |
| Hickory Solar Solar |
12.0 MW | Withdrawn / abandoned |
| Gas project AD2-109, Fayette County Gas |
12.0 MW | Withdrawn / abandoned |
| Solar project AE1-167, Accomack County Solar |
11.1 MW | Withdrawn / abandoned |
| Solar Solar |
11.0 MW | Withdrawn / abandoned |
| Other project AE2-009, Adams County Other |
11.0 MW | Withdrawn / abandoned |
| Solar (QF) Solar |
10.0 MW | Withdrawn / abandoned |
| Bluestone Battery Storage Battery storage ยท Bluestone Wind, LLC |
10.0 MW | Withdrawn / abandoned |
| Solar project 539, Malheur County Solar |
10.0 MW | Withdrawn / abandoned |
| Bethlehem Battery Battery storage ยท PSEG Power NY LLC |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Newport News Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AE1-182, Cumberland County Solar |
10.0 MW | Withdrawn / abandoned |
| Solar project AD2-052, Salem County Solar |
10.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)306 ยท 50.5 GW
- PJM (Mid-Atlantic, Midwest)311 ยท 46.6 GW
- MISO (Midcontinent)165 ยท 28.2 GW
- Southeast (non-ISO utilities)248 ยท 28.2 GW
- CAISO (California)67 ยท 21.7 GW
- SPP (Southwest Power Pool)92 ยท 16.8 GW
- ERCOT (Texas)77 ยท 15.0 GW
- NYISO (New York)74 ยท 11.2 GW
- ISO-NE (New England)84 ยท 8,151 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)