United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AE1-125, Shenandoah County
Solar project AE1-125, Shenandoah County is a 18.9 MW solar request withdrawn in the PJM interconnection queue, in Shenandoah County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-125
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Mt. Jackson 34.5 kV
- Location
- Shenandoah County, Virginia
- Technology
- Solar: 18.9 MW
- Total requested
- 18.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 19 September 2018
- Proposed online date
- November 2020
- Withdrawn
- March 2019
Location
Marker shows the centre of Shenandoah County; the queue data does not give exact sites.
Other requests in Shenandoah County
- Battery storage project AI1-186, Shenandoah CountyBattery storage Β· 140 MW Β· in study
- OFW Solar FarmSolar + storage Β· 75.0 MW Β· in study
- Gas project AH1-743, Shenandoah CountyGas Β· 334 MW Β· withdrawn
- Solar project AG1-131, Shenandoah CountySolar Β· 25.6 MW Β· withdrawn
- Solar project AG1-346, Shenandoah CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-179, Shenandoah CountySolar Β· 20.0 MW Β· withdrawn
- Mt. Jackson ISolar Β· 15.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem