United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AI1-186, Shenandoah County
Battery storage project AI1-186, Shenandoah County is a 140 MW battery storage request in interconnection study in the PJM interconnection queue, in Shenandoah County, Virginia, connecting to APS.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI1-186
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Strasburg 138 kV
- Location
- Shenandoah County, Virginia
- Technology
- Battery: 140 MW
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 9 September 2022
- Proposed online date
- December 2027
Location
Marker shows the centre of Shenandoah County; the queue data does not give exact sites.
Other requests in Shenandoah County
- OFW Solar FarmSolar + storage · 75.0 MW · in study
- Gas project AH1-743, Shenandoah CountyGas · 334 MW · withdrawn
- Solar project AG1-131, Shenandoah CountySolar · 25.6 MW · withdrawn
- Solar project AG1-346, Shenandoah CountySolar · 20.0 MW · withdrawn
- Solar project AH1-179, Shenandoah CountySolar · 20.0 MW · withdrawn
- Solar project AE1-125, Shenandoah CountySolar · 18.9 MW · withdrawn
- Mt. Jackson ISolar · 15.7 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem