SOLAR Β· PJMSolar project AH1-179, Shenandoah County
Solar project AH1-179, Shenandoah County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Shenandoah County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-179
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Valley Overlook Solar, LLC
- Connection point (POI)
- Edinburg - Woodstock DP 34.5 kV
- Location
- Shenandoah County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 August 2021
- Proposed online date
- December 2022
- Withdrawn
- April 2025
Location
Marker shows the centre of Shenandoah County; the queue data does not give exact sites.
Other requests in Shenandoah County
- Battery storage project AI1-186, Shenandoah CountyBattery storage Β· 140 MW Β· in study
- OFW Solar FarmSolar + storage Β· 75.0 MW Β· in study
- Gas project AH1-743, Shenandoah CountyGas Β· 334 MW Β· withdrawn
- Solar project AG1-131, Shenandoah CountySolar Β· 25.6 MW Β· withdrawn
- Solar project AG1-346, Shenandoah CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AE1-125, Shenandoah CountySolar Β· 18.9 MW Β· withdrawn
- Mt. Jackson ISolar Β· 15.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem