πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OTHER Β· PJM

Other project AE2-009, Adams County

Other project AE2-009, Adams County is a 11.0 MW other request withdrawn in the PJM interconnection queue, in Adams County, Pennsylvania, connecting to PECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-009
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Nottingham-Peach Bottom Tap 230 kV line
Location
Adams County, Pennsylvania
Technology
Other: 11.0 MW
Total requested
11.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study
Queue status
Withdrawn
Entered queue
17 October 2018
Proposed online date
June 2020
Withdrawn
March 2020

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem