🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 20

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 20 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
South Ridge
Solar
205 MWWithdrawn / abandoned Nye, NVCAISO May 2016target 2021
Ghost Town Solar
Solar
205 MWWithdrawn / abandoned San Bernardino, CACAISO May 2016target 2020
Red Wing Ranch Solar
Solar
205 MWWithdrawn / abandoned Yuma, AZCAISO May 2016target 2021
Blue Wing Ranch Solar
Solar
205 MWWithdrawn / abandoned Yuma, AZCAISO May 2016target 2021
Del Rancho
Solar + storage
205 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2018target 2021
Bull Run 2 Es
Battery storage
205 MWWithdrawn / abandoned Butte, CACAISO Apr 2021target 2030
Maravillosa Solar 1
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Antelope Plains Solar
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Quaking Aspen Storage
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Castleberry
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Calpeak Border Om 2
Gas
205 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Songbird BESS
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Melon Patch Solar
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Foxglove Hybrid Solar
Solar + storage
205 MWWithdrawn / abandoned Madera, CACAISO Apr 2020target 2023
Grand BESS
Battery storage
205 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2023target 2028
Torana Hybrid Solar
Solar + storage
205 MWWithdrawn / abandoned Merced, CACAISO Apr 2020target 2023
Chardonnay Storage Center
Battery storage
205 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2023target 2030
Montrose Storage
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sagitta
Battery storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sullivan Energy Center
Solar + storage
205 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Las Pilas
Battery storage
205 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2024
Michelangelo
Battery storage
205 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2024
Storybook
Battery storage
204 MWWithdrawn / abandoned Fresno, CACAISO Apr 2021target 2024
Green Mezzo
Battery storage
204 MWWithdrawn / abandoned Solano, CACAISO Apr 2018target 2022
Rowan
Solar + storage
204 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Valley Green
Battery storage
204 MWWithdrawn / abandoned Santa Cruz, CACAISO Apr 2021target 2024
Airfield
Solar + storage
204 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Thunder
Solar + storage
204 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2028
Double Butte 2
Battery storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Barbaro Storage
Battery storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Respire
Solar + storage
204 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Plumb
Solar + storage
204 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Romero Creek Solar
Solar
204 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2022
Hudson Solar 2
Solar + storage
204 MWWithdrawn / abandoned Fresno, CACAISO Apr 2018target 2022
Vermillion Energy Storage
Battery storage
204 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
LH Energy Storage
Battery storage
204 MWWithdrawn / abandoned Los Angeles, CACAISO May 2016target 2020
Austin Es
Battery storage
204 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2024
Spindrift Hybrid Solar
Solar + storage
204 MWWithdrawn / abandoned Sutter, CACAISO Apr 2019target 2022
Ellis BESS
Battery storage
203 MWWithdrawn / abandoned Orange, CACAISO Apr 2019target 2021
Ibra Storage
Battery storage
203 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Ronaldo Storage
Battery storage
203 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Seis Puntos Solar
Solar
203 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2018
Sargasso Storage
Battery storage
203 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2032
Salix
Solar + storage
202 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Hydrus Energy Storage
Battery storage
202 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Taurus Energy Storage
Battery storage
202 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Lanyard Energy Storage
Battery storage
202 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2024
Honey Bear
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Daggett Wind Project II
Onshore wind
201 MWWithdrawn / abandoned San Bernardino, CACAISO Dec 2006target 2012
Oso Negro
Solar + storage
201 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Page 20 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)