United States โ€บ Grid โ€บ Interconnection queues โ€บ California

OCTARY USA ยท INTERCONNECTION QUEUES

Interconnection queue in California (2023 requests) โ€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown11856.5 GW
Active in queue56.5 GW118 requests
Agreement signed0.0 MW0 requests
Withdrawn481189.0 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

118 requests ยท page 2 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Maravillosa 1
Solar + storage
407 MWIn study Kings, CACAISO Apr 2023target 2029
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Gamay
Solar + storage
400 MWIn study Kern, CACAISO Apr 2023target 2031
Comstock
Gas
398 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Battery storage project GI-2023-168, Imperial County
Battery storage
387 MWIn study Imperial, CAWest Apr 2023target 2025
MidBishop
Solar + storage
382 MWIn study Kings, CACAISO Apr 2023target 2029
Brown Bear
Solar + storage
378 MWIn study Kings, CACAISO Apr 2023target 2029
Circinus
Solar + storage
371 MWIn study Merced, CACAISO Apr 2023target 2031
Bajada
Solar
353 MWIn study Riverside, CACAISO Apr 2023target 2030
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Zama
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Argos Solar
Solar
352 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Galadriel
Battery storage
318 MWIn study Madera, CACAISO Apr 2023target 2031
Quaking Aspen
Solar + storage
318 MWIn study Kern, CACAISO Apr 2023target 2029
Cowboy
Solar + storage
312 MWIn study Colusa, CACAISO Apr 2023target 2030
Jackrabbit Power Bank
Battery storage
308 MWIn study Santa Clara, CACAISO Apr 2023target 2029
Green Palms
Solar
307 MWIn study Riverside, CACAISO Apr 2023target 2030
Gosford Solar Storage
Solar
305 MWIn study Kern, CACAISO Apr 2023target 2029
Twinkle
Battery storage
304 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Shoestring
Solar + storage
270 MWIn study Fresno, CACAISO Apr 2023target 2031
Geras
Solar + storage
268 MWIn study Stanislaus, CACAISO Apr 2023target 2028
Fika
Battery storage
259 MWIn study Merced, CACAISO Apr 2023target 2029
Zeitgeist K Energy Center
Battery storage
258 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Annapurna
Battery storage
257 MWIn study Merced, CACAISO Apr 2023target 2028
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Emerita Energy Storage
Battery storage
206 MWIn study Alameda, CACAISO Apr 2023target 2028
Helios Grid Reliability
Battery storage
206 MWIn study Calaveras, CACAISO Apr 2023target 2028
Telluride
Solar + storage
205 MWIn study Fresno, CACAISO Apr 2023target 2030
Cabrera Reliability
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Antlia
Battery storage
205 MWIn study Monterey, CACAISO Apr 2023target 2031
Saguaro Energy Storage
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2029
Mt Baldy Energy Storage 2
Battery storage
205 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Brundage Energy Storage
Battery storage
202 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Tendril
Solar + storage
200 MWIn study Kern, CACAISO Apr 2023target 2031
Conduit Energy Storage 2
Battery storage
199 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Lycan Solar 2
Solar
192 MWIn study Riverside, CACAISO Apr 2023target 2028
Geothermal project GI-2023-174, Imperial County
Geothermal
157 MWIn study Imperial, CAWest Apr 2023target 2029
Geothermal project GI-2023-176, Imperial County
Geothermal
157 MWIn study Imperial, CAWest Apr 2023target 2029
Hacienda
Solar
157 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Argenta
Solar
156 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Zinfandel Storage Center
Battery storage
154 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Solar + storage project GI-2023-175, Imperial County
Solar + storage
150 MWIn study Imperial, CAWest Apr 2023target 2028
Solar + storage project GI-2023-173, Imperial County
Solar + storage
150 MWIn study Imperial, CAWest Apr 2023target 2028
Solar project GI-2023-170, Imperial County
Solar
150 MWIn study Imperial, CAWest Apr 2023target 2026
Reflex
Solar
129 MWIn study Riverside, CACAISO Apr 2023target 2029
Holly Oaks
Battery storage
128 MWIn study Calaveras, CACAISO Apr 2023target 2028
Bonita Bateria 2
Battery storage
123 MWIn study Orange, CACAISO Apr 2023target 2029
Toland Renewable Energy Park
Onshore wind
108 MWIn study Solano, CACAISO Apr 2023target 2029

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)