United States โบ Grid โบ Interconnection queues โบ California
OCTARY USA ยท INTERCONNECTION QUEUESInterconnection queue in California (2023 requests) โ page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Maravillosa 1 Solar + storage |
407 MW | In study |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Gamay Solar + storage |
400 MW | In study |
| Comstock Gas |
398 MW | In study |
| Battery storage project GI-2023-168, Imperial County Battery storage |
387 MW | In study |
| MidBishop Solar + storage |
382 MW | In study |
| Brown Bear Solar + storage |
378 MW | In study |
| Circinus Solar + storage |
371 MW | In study |
| Bajada Solar |
353 MW | In study |
| Moonraker Battery storage |
353 MW | In study |
| Zama Battery storage |
353 MW | In study |
| Argos Solar Solar |
352 MW | In study |
| Galadriel Battery storage |
318 MW | In study |
| Quaking Aspen Solar + storage |
318 MW | In study |
| Cowboy Solar + storage |
312 MW | In study |
| Jackrabbit Power Bank Battery storage |
308 MW | In study |
| Green Palms Solar |
307 MW | In study |
| Gosford Solar Storage Solar |
305 MW | In study |
| Twinkle Battery storage |
304 MW | In study |
| Shoestring Solar + storage |
270 MW | In study |
| Geras Solar + storage |
268 MW | In study |
| Fika Battery storage |
259 MW | In study |
| Zeitgeist K Energy Center Battery storage |
258 MW | In study |
| Annapurna Battery storage |
257 MW | In study |
| Octans Solar + storage |
207 MW | In study |
| Fornax Solar + storage |
206 MW | In study |
| Rover Battery storage |
206 MW | In study |
| Emerita Energy Storage Battery storage |
206 MW | In study |
| Helios Grid Reliability Battery storage |
206 MW | In study |
| Telluride Solar + storage |
205 MW | In study |
| Cabrera Reliability Battery storage |
205 MW | In study |
| Antlia Battery storage |
205 MW | In study |
| Saguaro Energy Storage Battery storage |
205 MW | In study |
| Mt Baldy Energy Storage 2 Battery storage |
205 MW | In study |
| Brundage Energy Storage Battery storage |
202 MW | In study |
| Tendril Solar + storage |
200 MW | In study |
| Conduit Energy Storage 2 Battery storage |
199 MW | In study |
| Lycan Solar 2 Solar |
192 MW | In study |
| Geothermal project GI-2023-174, Imperial County Geothermal |
157 MW | In study |
| Geothermal project GI-2023-176, Imperial County Geothermal |
157 MW | In study |
| Hacienda Solar |
157 MW | In study |
| Argenta Solar |
156 MW | In study |
| Zinfandel Storage Center Battery storage |
154 MW | In study |
| Solar + storage project GI-2023-175, Imperial County Solar + storage |
150 MW | In study |
| Solar + storage project GI-2023-173, Imperial County Solar + storage |
150 MW | In study |
| Solar project GI-2023-170, Imperial County Solar |
150 MW | In study |
| Reflex Solar |
129 MW | In study |
| Holly Oaks Battery storage |
128 MW | In study |
| Bonita Bateria 2 Battery storage |
123 MW | In study |
| Toland Renewable Energy Park Onshore wind |
108 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)