United States › Grid › Interconnection queues › California

SOLAR · WEST

Solar project GI-2023-170, Imperial County

Solar project GI-2023-170, Imperial County is a 150 MW solar request in interconnection study in the West interconnection queue, in Imperial County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Apr 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2023-170
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
Wixom Switching Station
Location
Imperial County, California
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
21 April 2023
Proposed online date
December 2026

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem