United States โบ Grid โบ Interconnection queues โบ California
OCTARY USA ยท INTERCONNECTION QUEUESInterconnection queue in California (2021 requests) โ page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Northeast Central Valley Battery storage |
365 MW | In study |
| Allegheny Energy Storage Battery storage |
353 MW | Agreement signed |
| Solar + storage project 8, Sacramento County Solar + storage |
344 MW | In study |
| Ariella Solar Solar + storage |
327 MW | Agreement signed |
| Spikes Peak Solar Solar + storage |
318 MW | Agreement signed |
| Cargo Storage Battery storage |
313 MW | In study |
| Haven Storage Battery storage |
313 MW | Agreement signed |
| Bell Bluff Storage Battery storage |
313 MW | In study |
| Harmony Storage 2 Battery storage |
308 MW | In study |
| Juniper Storage Solar + storage |
307 MW | In study |
| Gnarly Osage Battery storage |
304 MW | In study |
| Elion Energy Storage Battery storage |
302 MW | Agreement signed |
| Tyrell Energy Storage Battery storage |
302 MW | Agreement signed |
| Tabla Energy Storage Battery storage |
302 MW | Agreement signed |
| Onshore wind project Company LF, Lassen County Onshore wind |
300 MW | Paused / redesign |
| Electron Battery storage |
300 MW | Agreement signed |
| Battery storage project Q82, Los Angeles County Battery storage |
300 MW | In study |
| Carmine Battery storage |
292 MW | In study |
| Pathfinder Storage Battery storage |
268 MW | Agreement signed |
| J90 Energy Storage Battery storage |
261 MW | Agreement signed |
| Commerce Energy Storage 3 Battery storage |
256 MW | Agreement signed |
| Almande Energy Storage Battery storage |
256 MW | In study |
| Sherman Energy Storage Battery storage |
256 MW | In study |
| Gateway Energy Storage 2 Battery storage |
256 MW | In study |
| Sandbar Energy Storage Battery storage |
256 MW | In study |
| Ciervo Mountain Hybrid Solar + storage |
255 MW | Agreement signed |
| Sandrift Storage 1 Battery storage |
255 MW | Agreement signed |
| Sandrift Storage 2 Battery storage |
255 MW | Agreement signed |
| Greenwood Energy Storage Battery storage |
252 MW | Agreement signed |
| Zorin Storage Battery storage |
252 MW | Agreement signed |
| Solar + storage project 12, Sacramento County Solar + storage |
250 MW | In study |
| Baylands Battery Battery storage |
250 MW | Agreement signed |
| Allium Hybrid Solar + storage |
225 MW | Agreement signed |
| Dorian Storage Battery storage |
214 MW | Agreement signed |
| Zeus BESS Battery storage |
214 MW | Agreement signed |
| Weston Storage Battery storage |
214 MW | In study |
| Frigatebird Storage Battery storage |
214 MW | In study |
| Desert Jewel Storage Battery storage |
206 MW | Agreement signed |
| Phaenon Solar + storage |
204 MW | In study |
| Huaso Hybrid Solar + storage |
204 MW | Agreement signed |
| Puma Storage Battery storage |
204 MW | In study |
| Seahawk Storage Battery storage |
204 MW | Agreement signed |
| Cougar Storage Battery storage |
204 MW | Agreement signed |
| Apache Storage Battery storage |
204 MW | Agreement signed |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Battery storage project Q81, Los Angeles County Battery storage |
200 MW | In study |
| Merlin Storage Battery storage |
200 MW | In study |
| Battery storage project 11, Sacramento County Battery storage |
200 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)