United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Projects with signed interconnection agreements in CAISO (California) — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown23596.2 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

235 requests · page 2 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Daggett Solar 3
Solar + storage
522 MWAgreement signed San Bernardino, CACAISO May 2016target 2023
Yellow Pine 3
Solar + storage
517 MWAgreement signed Clark, NVCAISO Apr 2019target 2026
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Cobalt
Solar + storage
513 MWAgreement signed Riverside, CACAISO Apr 2020target 2027
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Double Butte Storage
Battery storage
508 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Ocotillo Express
Wind + storage
504 MWAgreement signed Imperial, CACAISO Jul 20092013
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Ironwood Solar
Solar + storage
500 MWAgreement signed Yuma, AZCAISO May 2017target 2026
Lake Elsinore Advanced Pumped Storage Project
Battery storage
500 MWAgreement signed Riverside, CACAISO Jun 2005target 2028
Calvada Springs Solar
Solar + storage
500 MWAgreement signed Inyo, CACAISO Apr 2020target 2027
Goldback Solar Center
Battery storage
500 MWAgreement signed Ventura, CACAISO Apr 2019target 2026
Pluot
Solar + storage
479 MWAgreement signed Kings, CACAISO May 2016target 2026
Pomegranate
Solar + storage
479 MWAgreement signed Kings, CACAISO May 2016target 2025
Big SKY Solar
Solar + storage
476 MWAgreement signed Los Angeles, CACAISO Mar 2011target 2023
Elysian
Solar + storage
412 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Dos Palmas
Battery storage
411 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Shoals Energy Storage
Battery storage
409 MWAgreement signed Ventura, CACAISO Apr 2020target 2030
Hidalgo Energy Storage
Battery storage
408 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2033
Rough Hat 2
Solar + storage
408 MWAgreement signed Clark, NVCAISO Apr 2020target 2027
Clarkson
Solar + storage
408 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Rough Hat Hybrid Solar
Solar + storage
404 MWAgreement signed Nye, NVCAISO Apr 2019target 2028
Mount Laguna Wind 2
Onshore wind
400 MWAgreement signed San Diego, CACAISO May 2017target 2031
Driftwood Stella
Solar + storage
400 MWAgreement signed Kern, CACAISO May 2017target 2026
Aratina Solar Center 2
Solar + storage
400 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Rexford 2 Solar Farm
Solar + storage
400 MWAgreement signed Tulare, CACAISO Apr 2020target 2027
Aratina Solar Center 1
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2026
Sienna Solar Farm
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2027
White Wing Ranch Solar
Solar + storage
400 MWAgreement signed Yuma, AZCAISO Apr 2014target 2026
Water Rock Solar 1
Solar + storage
400 MWAgreement signed Nye, NVCAISO Apr 2020target 2027
Sonrisa
Solar + storage
384 MWAgreement signed Fresno, CACAISO May 2017target 2026
Luna Valley Solar
Solar + storage
373 MWAgreement signed Fresno, CACAISO Apr 2015target 2028
Golden Flats
Battery storage
365 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2031
Espresso
Battery storage
365 MWAgreement signed Alameda, CACAISO Apr 2021target 2031
Jewelflower Storage
Battery storage
355 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2029
Allegheny Energy Storage
Battery storage
353 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Dateland Energy Complex
Solar + storage
350 MWAgreement signed Yuma, AZCAISO Apr 2020target 2027
Ariella Solar
Solar + storage
327 MWAgreement signed Tulare, CACAISO Apr 2021target 2030
Spikes Peak Solar
Solar + storage
318 MWAgreement signed Merced, CACAISO Apr 2021target 2029
Corby
Battery storage
314 MWAgreement signed Solano, CACAISO May 2016target 2027
Haven Storage
Battery storage
313 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Roadhouse Storage
Battery storage
313 MWAgreement signed San Bernardino, CACAISO Apr 2020target 2027
East Field Energy Storage
Battery storage
313 MWAgreement signed San Diego, CACAISO Apr 2020target 2030

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)