United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Daggett Solar 3 Solar + storage |
522 MW | Agreement signed |
| Yellow Pine 3 Solar + storage |
517 MW | Agreement signed |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Cobalt Solar + storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Double Butte Storage Battery storage |
508 MW | Agreement signed |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Ocotillo Express Wind + storage |
504 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
| Ironwood Solar Solar + storage |
500 MW | Agreement signed |
| Lake Elsinore Advanced Pumped Storage Project Battery storage |
500 MW | Agreement signed |
| Calvada Springs Solar Solar + storage |
500 MW | Agreement signed |
| Goldback Solar Center Battery storage |
500 MW | Agreement signed |
| Pluot Solar + storage |
479 MW | Agreement signed |
| Pomegranate Solar + storage |
479 MW | Agreement signed |
| Big SKY Solar Solar + storage |
476 MW | Agreement signed |
| Elysian Solar + storage |
412 MW | Agreement signed |
| Dos Palmas Battery storage |
411 MW | Agreement signed |
| Shoals Energy Storage Battery storage |
409 MW | Agreement signed |
| Hidalgo Energy Storage Battery storage |
408 MW | Agreement signed |
| Rough Hat 2 Solar + storage |
408 MW | Agreement signed |
| Clarkson Solar + storage |
408 MW | Agreement signed |
| Gabriel Storage Battery storage |
406 MW | Agreement signed |
| Trolley Battery storage |
406 MW | Agreement signed |
| Marici Battery storage |
406 MW | Agreement signed |
| Rough Hat Hybrid Solar Solar + storage |
404 MW | Agreement signed |
| Mount Laguna Wind 2 Onshore wind |
400 MW | Agreement signed |
| Driftwood Stella Solar + storage |
400 MW | Agreement signed |
| Aratina Solar Center 2 Solar + storage |
400 MW | Agreement signed |
| Rexford 2 Solar Farm Solar + storage |
400 MW | Agreement signed |
| Aratina Solar Center 1 Solar + storage |
400 MW | Agreement signed |
| Sienna Solar Farm Solar + storage |
400 MW | Agreement signed |
| White Wing Ranch Solar Solar + storage |
400 MW | Agreement signed |
| Water Rock Solar 1 Solar + storage |
400 MW | Agreement signed |
| Sonrisa Solar + storage |
384 MW | Agreement signed |
| Luna Valley Solar Solar + storage |
373 MW | Agreement signed |
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Jewelflower Storage Battery storage |
355 MW | Agreement signed |
| Allegheny Energy Storage Battery storage |
353 MW | Agreement signed |
| Dateland Energy Complex Solar + storage |
350 MW | Agreement signed |
| Ariella Solar Solar + storage |
327 MW | Agreement signed |
| Spikes Peak Solar Solar + storage |
318 MW | Agreement signed |
| Corby Battery storage |
314 MW | Agreement signed |
| Haven Storage Battery storage |
313 MW | Agreement signed |
| Roadhouse Storage Battery storage |
313 MW | Agreement signed |
| East Field Energy Storage Battery storage |
313 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- CAISO (California)235 · 96.2 GW
- West (non-ISO utilities)349 · 60.6 GW
- Southeast (non-ISO utilities)192 · 37.8 GW
- SPP (Southwest Power Pool)212 · 37.6 GW
- PJM (Mid-Atlantic, Midwest)343 · 35.0 GW
- MISO (Midcontinent)187 · 28.1 GW
- ISO-NE (New England)45 · 8,609 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)