🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 16

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 16 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Palomas Valley
Solar + storage
271 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Sandy Valley Phase I Segs (Fka Pahrump Valley Segs)
Solar
270 MWWithdrawn / abandoned Clark, NVCAISO Mar 2011target 2016
Crestley
Battery storage
270 MWWithdrawn / abandoned Merced, CACAISO Apr 2023target 2031
Placid
Solar + storage
270 MWWithdrawn / abandoned Fresno, CACAISO Apr 2018target 2021
Sonoran West I Segs
Solar
270 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2016
Elderflower Solar
Solar + storage
266 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Golden Evening Solar
Solar
265 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2019
Gaskell Solar Generating Station
Solar
264 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2012
Willow Springs Solar Generating Station II
Solar
264 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2011
Longspur 10
Solar
264 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Four Creeks Energy Storage
Battery storage
261 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2030
Hub City Energy Storage
Battery storage
261 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2031
West Hills Energy Storage
Battery storage
261 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
Vertigo BESS
Battery storage
260 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Brightsource Av Project
Solar
260 MWWithdrawn / abandoned Los Angeles, CACAISO Jul 2010target 2015
Rana BESS
Battery storage
260 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Lodi Generating Station
Gas
260 MWWithdrawn / abandoned San Joaquin, CACAISO Sep 2007target 2012
Garibaldi BESS
Battery storage
260 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Rosy 9
Solar
260 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Aridpeak Storage
Battery storage
259 MWWithdrawn / abandoned Kern, CACAISO Apr 2023target 2030
Fritts Hybrid
Solar + storage
259 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Norton Energy Storage
Battery storage
259 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Vulcan Secundus
Solar + storage
259 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Aquarius
Solar + storage
259 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Butterfield Stage Solar
Solar + storage
258 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Dutton Solar
Solar + storage
258 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Alta 20 Wind
Onshore wind
258 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Kentucky Springs Energy Storage
Battery storage
257 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Fika Solar
Battery storage
257 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Alviso Energy Storage
Battery storage
256 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2021target 2032
Gateway Energy Storage 3
Battery storage
256 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Delamar Energy Storage 3
Battery storage
256 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Maathai
Battery storage
256 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2033
Poseidon
Solar + storage
256 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2020
LeConte Energy Storage 2
Battery storage
256 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Almande Energy Storage 2
Battery storage
256 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Tres Rios Energy Center
Solar + storage
256 MWWithdrawn / abandoned Yuba, CACAISO Apr 2021target 2025
Gigawatt Farm
Battery storage
255 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Arrow
Solar + storage
255 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2024
Vista Reliability
Battery storage
254 MWWithdrawn / abandoned Los Angeles, CACAISO Jan 2023target 2024
Ventana Energy Storage
Battery storage
254 MWWithdrawn / abandoned San Bernardino, CACAISO Jun 2022target 2024
Ventana Reliability Project
Battery storage
254 MWWithdrawn / abandoned San Bernardino, CACAISO Jan 2023target 2024
Peakland
Battery storage
254 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sargadelos Storage
Battery storage
254 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Brisbane Energy Storage
Battery storage
254 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2020target 2023
Gargantua Storage
Battery storage
253 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2024
Ig Tehama Solar
Solar
253 MWWithdrawn / abandoned Tehama, CACAISO May 2016target 2019
Lagunez
Solar + storage
253 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Risu
Battery storage
253 MWWithdrawn / abandoned Orange, CACAISO Apr 2021target 2030
Whiptail Solar
Solar
252 MWWithdrawn / abandoned Fresno, CACAISO Apr 2023target 2028
Page 16 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)