United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Aridpeak Storage

Aridpeak Storage is a 259 MW battery storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedMay 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2326
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
CALIENTE SW STA-MIDWAY #1
Location
Kern County, California
Technology
Battery: 259 MW
Total requested
259 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
February 2030
Withdrawn
May 2025

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem