United States β€Ί Grid β€Ί Interconnection queues β€Ί California

BATTERY STORAGE Β· CAISO

Peakland

Peakland is a 254 MW battery storage request withdrawn in the CAISO interconnection queue, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
54941
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
WHIRLWIND 500 kV
Location
California
Technology
Battery: 254 MW
Total requested
254 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
April 2031
Withdrawn
December 2024

Location

Marker shows the centre of County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem