United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOFour Creeks Energy Storage
Four Creeks Energy Storage is a 261 MW battery storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2058
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- Rector Substation 230 kV
- Location
- Tulare County, California
- Technology
- Battery: 261 MW
- Total requested
- 261 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- July 2030
- Withdrawn
- September 2025
Location
Marker shows the centre of Tulare County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Tulare County
- Rexford 2 Solar FarmSolar + storage · 400 MW · agreement signed
- Ariella SolarSolar + storage · 327 MW · agreement signed
- AngelaSolar + storage · 60.0 MW · agreement signed
- Lake Alpaugh Battery StorageBattery storage · 10.0 MW · agreement signed
- MusketeersSolar + storage · 1,047 MW · in study
- SolskenSolar + storage · 809 MW · in study
- Mineral King SolarSolar + storage · 430 MW · in study
- SequoiaSolar + storage · 400 MW · in study
- Bobor StorageBattery storage · 152 MW · in study
- Rexford Solar FarmSolar + storage · 540 MW · built
- Alpaugh PV Solar Generation FacilitySolar · 50.0 MW · built
- White River PV 20MVA Solar Generation FacilitySolar · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem