United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Whiptail Solar

Whiptail Solar is a 252 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2233
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
MANNING - TRANQUILITY #1
Location
Fresno County, California
Technology
Solar: 252 MW
Total requested
252 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
October 2028
Withdrawn
December 2025

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem