United States β€Ί Grid β€Ί Interconnection queues β€Ί California

BATTERY STORAGE Β· CAISO

Risu

Risu is a 253 MW battery storage request withdrawn in the CAISO interconnection queue, in Orange County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2119
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Villa Park Substation 230 kV
Location
Orange County, California
Technology
Battery: 253 MW
Total requested
253 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
October 2030
Withdrawn
December 2022

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem