United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Linwood Solar Farm Solar + storage |
405 MW | Withdrawn / abandoned |
| Familia Hybrid Solar Solar + storage |
405 MW | Withdrawn / abandoned |
| Comal Flats 1 Solar + storage |
405 MW | Withdrawn / abandoned |
| Tava Flats Solar + storage |
405 MW | Withdrawn / abandoned |
| Altilium Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Pelagic Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Pisces Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Sageberry Solar Solar + storage |
404 MW | Withdrawn / abandoned |
| Aquarius Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Jaciva Energy Storage Battery storage |
404 MW | Withdrawn / abandoned |
| Garces Hybrid Solar Solar + storage |
403 MW | Withdrawn / abandoned |
| Agua Amarga Wind Onshore wind |
403 MW | Withdrawn / abandoned |
| DRY Grape Hybrid Solar Solar + storage |
403 MW | Withdrawn / abandoned |
| Vista Power Project Gas |
402 MW | Withdrawn / abandoned |
| North Highland Solar + storage |
401 MW | Withdrawn / abandoned |
| Sheep Mountain Solar + storage |
401 MW | Withdrawn / abandoned |
| Hyder Valley Farms Solar + storage |
401 MW | Withdrawn / abandoned |
| Box Ranch 1 Solar + storage |
401 MW | Withdrawn / abandoned |
| East Mule Solar + storage |
401 MW | Withdrawn / abandoned |
| Box Ranch 2 Solar + storage |
401 MW | Withdrawn / abandoned |
| Shadow Hills Solar + storage |
401 MW | Withdrawn / abandoned |
| Sandy Valley Solar + storage |
401 MW | Withdrawn / abandoned |
| Ulatis Creek Solar + storage |
401 MW | Withdrawn / abandoned |
| Hickory Solar Farm Solar |
400 MW | Withdrawn / abandoned |
| Canella 2 Solar Farm Solar + storage |
400 MW | Withdrawn / abandoned |
| Siberia Phase I Segs (Fka DPT Broadwell Lake II) Solar |
400 MW | Withdrawn / abandoned |
| Yellow Hay Hybrid Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| DPT Broadwell Lake Solar |
400 MW | Withdrawn / abandoned |
| Lotus 3 Battery storage |
400 MW | Withdrawn / abandoned |
| Collomia Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Lakey Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| Solar + storage project G0868, Modoc County Solar + storage |
400 MW | Withdrawn / abandoned |
| Hydrogen Energy California Gas |
400 MW | Withdrawn / abandoned |
| Silkie Battery storage |
400 MW | Withdrawn / abandoned |
| Amboy Onshore wind |
400 MW | Withdrawn / abandoned |
| Idris Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Patterson Pass GT Project Gas |
400 MW | Withdrawn / abandoned |
| Desert Jasper PV Solar |
400 MW | Withdrawn / abandoned |
| Kramm Battery storage |
400 MW | Withdrawn / abandoned |
| Palo Verde Energy Storage Battery storage |
400 MW | Withdrawn / abandoned |
| Solar + storage project Q72, San Bernardino County Solar + storage |
400 MW | Withdrawn / abandoned |
| Pavion Battery storage |
400 MW | Withdrawn / abandoned |
| Fitzgibbons Solar Solar + storage |
400 MW | Withdrawn / abandoned |
| Wellhead Power Kern 3 Gas |
400 MW | Withdrawn / abandoned |
| Solar project 2, Sacramento County Solar |
400 MW | Withdrawn / abandoned |
| Star Generation Gas |
400 MW | Withdrawn / abandoned |
| Siberia Phase II Segs (Fka DPT 9) Solar |
400 MW | Withdrawn / abandoned |
| CPV California II Gas |
400 MW | Withdrawn / abandoned |
| Soldier Flat Onshore wind |
400 MW | Withdrawn / abandoned |
| Solar project Q39, Kern County Solar |
396 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)