Garces Hybrid Solar

Garces Hybrid Solar is a 403 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1634
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Windhub Substation 230 kV
Location
Kern County, California
Technology
Solar: 203 MW · Battery: 200 MW
Total requested
403 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
November 2022
Withdrawn
July 2019

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.