United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· WEST

Solar + storage project Q72, San Bernardino County

Solar + storage project Q72, San Bernardino County is a 400 MW solar + storage request withdrawn in the West interconnection queue, in San Bernardino County, California, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q72
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Adelanto 500kV Substation
Location
San Bernardino County, California
Technology
Solar: 200 MW Β· Battery: 200 MW
Total requested
400 MW
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
22 July 2019
Proposed online date
November 2021

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem