🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR · CAISO

Desert Jasper PV

Desert Jasper PV is a 400 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2007 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
271
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Lugo-Pisgah 230kV line
Location
San Bernardino County, California
Technology
Solar: 400 MW
Total requested
400 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 November 2007
Proposed online date
September 2016
Withdrawn
December 2009

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem