🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Familia Hybrid Solar

Familia Hybrid Solar is a 405 MW solar + storage request withdrawn in the CAISO interconnection queue, in Maricopa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1601
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Midway-Wheeler Ridge #2 230kV
Location
Maricopa County, California
Technology
Solar: 203 MW · Battery: 203 MW
Total requested
405 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
November 2022
Withdrawn
March 2020

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem